Student Facility on Pulteney Street – Adelaide

South Australia

Challenge

To reduce energy usage and to reduce the wear and tear on the plant by providing cool dry fresh air to the refrigerated cooling system.

Solution

Climate Wizard Pre-Cooling
Installation of two Climate Wizard 10kW (2.8 ton) air conditioners directly connected to the air handling unit in the basement of the building. The high efficiency of Climate Wizard allowed the consultant to downsize the refrigerated system capacity, saving both energy and capital cost.

 

 

Coronavirus (COVID-19) Business updateLearn More
+ +